Uploaded image for project: 'camunda BPM'
  1. camunda BPM
  2. CAM-2899

I can use variable listeners in BPMN processes

XMLWordPrintable

    • Icon: Feature Request Feature Request
    • Resolution: Won't Fix
    • Icon: L3 - Default L3 - Default
    • None
    • None
    • engine
    • None

      AT:

      • There exists a variableListener extension element that can be declared on BPMN scopes (i.e. tasks, embedded subprocesses, processes, etc.)
      • Variable listeners semantics are the same as for the CMMN implementation

      Hints:

      • Think about how variable listeners can work with asynchronous continuations. For example, when a process is started asynchronously, we fire the historic events AFTER the async continuation. The same should probably be possible with the variable events.

        This is the controller panel for Smart Panels app

              Unassigned Unassigned
              thorben.lindhauer Thorben Lindhauer
              Votes:
              2 Vote for this issue
              Watchers:
              2 Start watching this issue

                Created:
                Updated:
                Resolved: