Details
-
Bug Report
-
Resolution: Duplicate
-
L3 - Default
-
None
-
None
Description
Steps to reproduce:
- create a new Bpmn 2.0 Diagram
- add a pool to the diagram (resize the pool: make it bigger)
- add the pool the following elements (start event -> sub process -> end event)
- resize the subprocess (make it bigger)
- save the diagram
- close the diagram
- reopen the diagram
-> The pool has not the correct size (the DI-Informations are not saved correctly)
mgm-controller-panel
This is the controller panel for Smart Panels app
Attachments
Issue Links
- duplicates
-
CAM-574 DI of Pools not correct after reopening
- Closed