A pool containing a subprocess does not save DI-Information

XMLWordPrintable

      Steps to reproduce:

      • create a new Bpmn 2.0 Diagram
      • add a pool to the diagram (resize the pool: make it bigger)
      • add the pool the following elements (start event -> sub process -> end event)
      • resize the subprocess (make it bigger)
      • save the diagram
      • close the diagram
      • reopen the diagram

      -> The pool has not the correct size (the DI-Informations are not saved correctly)

        This is the controller panel for Smart Panels app

              Assignee:
              Roman Smirnov
              Reporter:
              Roman Smirnov
              Votes:
              0 Vote for this issue
              Watchers:
              1 Start watching this issue

                Created:
                Updated:
                Resolved: