Uploaded image for project: 'Camunda Optimize'
  1. Camunda Optimize
  2. OPT-2097 Flow Node Execution Status selection (running, completed, all)
  3. OPT-2261

Running/completed/all execution state control for usertask/flownode reports

XMLWordPrintable

    • Icon: Sub-task Sub-task
    • Resolution: Done
    • Icon: L3 - Default L3 - Default
    • 2.5.0
    • None
    • frontend

      Frontendticket for the backend changes OPT-2222:
      report configuration has a new property flowNodeExecutionState that changes the evaluation result of reports grouped by flownode/usertasks to include running/completed/all user tasks

        This is the controller panel for Smart Panels app

              Unassigned Unassigned
              michael.wagner Michael
              Votes:
              0 Vote for this issue
              Watchers:
              2 Start watching this issue

                Created:
                Updated:
                Resolved: