Uploaded image for project: 'Camunda Optimize'
  1. Camunda Optimize
  2. OPT-2097 Flow Node Execution Status selection (running, completed, all)
  3. OPT-2261

Running/completed/all execution state control for usertask/flownode reports

    XMLWordPrintable

Details

    • Sub-task
    • Resolution: Done
    • L3 - Default
    • 2.5.0
    • None
    • frontend

    Description

      Frontendticket for the backend changes OPT-2222:
      report configuration has a new property flowNodeExecutionState that changes the evaluation result of reports grouped by flownode/usertasks to include running/completed/all user tasks

      mgm-controller-panel

        This is the controller panel for Smart Panels app

        Attachments

          Issue Links

            Activity

              People

                Unassigned Unassigned
                michael.wagner Michael
                Votes:
                0 Vote for this issue
                Watchers:
                2 Start watching this issue

                Dates

                  Created:
                  Updated:
                  Resolved:

                  Salesforce