Uploaded image for project: 'Camunda Optimize'
  1. Camunda Optimize
  2. OPT-2097

Flow Node Execution Status selection (running, completed, all)

    XMLWordPrintable

    Details

      Description

      • given:
        • There is data with running and completed user tasks in the engine or potentially other running/completed flow nodes
        • This data is imported into Optimize

      UserTasks:

      • when:
        • I create a report with user task: duration view (and whatever visualization/grouping, etc)
      • then:
        • I see results for all user tasks (the running and completed ones)
        • It is possible to change the configuration to either show user tasks that are running, completed or all
      • such that:
        • I can compare running and completed user tasks

      FlowNodes:

      • when:
        • I create a report with flownode: duration or count view (and any visualization/grouping)
      • then:
        • I see results for all flow nodes (running + completed)
        • It is possible to change the configuration to either show flownodes that are running, completed or all
      • such that:
        • I can compare running and completed flownodes

      Additional Infos:
      New property: flowNodeExecutionState in configuration field of the report. Can have the values completed, running and all

      User Interface:
      See attachments for screendesign

        Attachments

          Activity

            People

            Assignee:
            Unassigned
            Reporter:
            felix.mueller Felix Müller
            Votes:
            0 Vote for this issue
            Watchers:
            2 Start watching this issue

              Dates

              Created:
              Updated:
              Resolved: