Uploaded image for project: 'Camunda Optimize'
  1. Camunda Optimize
  2. OPT-7381

Create tasks table under diagram

    XMLWordPrintable

Details

    Description

      Context:

      https://miro.com/app/board/uXjVP3UOq6s=/?moveToWidget=3458764567897598402&cot=14

      AT:

      On outlier analysis page under the process diagram add a new table with tasks overview

      Testing Notes:

      • go to task analysis (old outlier analysis)
      • select a process which have outliers
      • the new table should be displayed under the diagram listing all the tasks which have outliers and corresponding metrics for each task
      • the view details button should open the details modal (same action as the view details button in tooltip displayed when hovering over the node on the diagram)

      mgm-controller-panel

        This is the controller panel for Smart Panels app

        Attachments

          Activity

            People

              Unassigned Unassigned
              michal.konopski Michal Konopski
              Votes:
              0 Vote for this issue
              Watchers:
              1 Start watching this issue

              Dates

                Created:
                Updated:
                Resolved:

                Salesforce