Uploaded image for project: 'Camunda Optimize'
  1. Camunda Optimize
  2. OPT-7381

Create tasks table under diagram

XMLWordPrintable

      Context:

      https://miro.com/app/board/uXjVP3UOq6s=/?moveToWidget=3458764567897598402&cot=14

      AT:

      On outlier analysis page under the process diagram add a new table with tasks overview

      Testing Notes:

      • go to task analysis (old outlier analysis)
      • select a process which have outliers
      • the new table should be displayed under the diagram listing all the tasks which have outliers and corresponding metrics for each task
      • the view details button should open the details modal (same action as the view details button in tooltip displayed when hovering over the node on the diagram)

        This is the controller panel for Smart Panels app

              Unassigned Unassigned
              michal.konopski Michal Konopski
              Votes:
              0 Vote for this issue
              Watchers:
              1 Start watching this issue

                Created:
                Updated:
                Resolved: