Uploaded image for project: 'Camunda Optimize'
  1. Camunda Optimize
  2. OPT-2097

Flow Node Execution Status selection (running, completed, all)

XMLWordPrintable

      • given:
        • There is data with running and completed user tasks in the engine or potentially other running/completed flow nodes
        • This data is imported into Optimize

      UserTasks:

      • when:
        • I create a report with user task: duration view (and whatever visualization/grouping, etc)
      • then:
        • I see results for all user tasks (the running and completed ones)
        • It is possible to change the configuration to either show user tasks that are running, completed or all
      • such that:
        • I can compare running and completed user tasks

      FlowNodes:

      • when:
        • I create a report with flownode: duration or count view (and any visualization/grouping)
      • then:
        • I see results for all flow nodes (running + completed)
        • It is possible to change the configuration to either show flownodes that are running, completed or all
      • such that:
        • I can compare running and completed flownodes

      Additional Infos:
      New property: flowNodeExecutionState in configuration field of the report. Can have the values completed, running and all

      User Interface:
      See attachments for screendesign

        This is the controller panel for Smart Panels app

              Unassigned Unassigned
              felix.mueller Felix Mueller
              Votes:
              0 Vote for this issue
              Watchers:
              2 Start watching this issue

                Created:
                Updated:
                Resolved: